Blog · 17 October 2026 · 6 min read

How to quote a painting job from plans

Builders send plans and want a price by Friday. Quoting from plans is a skill: miss a ceiling height or a stairwell and the job's gone backwards before you've opened a tin. Here's a method that keeps it fast and catches the expensive mistakes.

1. Read the whole set first

Before you measure anything, go through every page. The floor plan, elevations, sections, the finishes schedule and the specs. Ceiling heights live on the sections. What gets painted, and what doesn't, lives in the finishes schedule. Note anything unusual: raked ceilings, voids, feature walls, timber to stain, steel to coat.

2. Check the scale

Check one dimension you know against the scale before you trust any measurement. A plan printed at the wrong size will throw every number out. Pick a long dimension written on the plan and measure it.

3. Measure room by room

4. Turn areas into hours

Divide each area by how fast your crew does that surface. If your crew does walls at 10 square metres an hour for two coats, 400 square metres is 40 hours. Use your own crew's speed, from finished jobs, not a number from somewhere else. That's covered in how to price painting per square metre.

5. Price it line by line

Put each surface on its own quote line: hours times your charge-out rate, plus paint and sundries. Line by line pricing makes the quote easy for the builder to check, makes progress claims simple, and lets you see later which line ran over.

6. Check it before it goes

If your hourly rate is a guess, every line of the quote is a guess. Check it with the free rate check before you price the next set of plans.

Check your rate on your own numbers

Two minutes, free, no sign up to see the answer.

Do the free rate check